Virginia Administrative Code (Last Updated: January 10, 2017) |
Title 4. Conservation and Natural Resources |
Agency 50. Virginia Soil and Water Conservation Board |
Chapter 20. Impounding Structure Regulations |
Section 10. Authority |
Section 20. General provisions |
Section 30. Definitions |
Section 40. Hazard potential classifications of impounding structures |
Section 45. Hazard potential classifications based on low volume roadways. |
Section 50. Performance standards required for impounding structures |
Section 51. Special criteria for certain low hazard impounding structures |
Section 52. Incremental damage analysis |
Section 53. Special criteria for reduced SDF requirement for certain high hazard dams |
Section 54. Dam break inundation zone mapping |
Section 58. Local government notifications |
Section 59. Reporting |
Section 60. Required permits |
Section 70. Construction permits |
Section 80. Alterations permits |
Section 90. Transfer of permits |
Section 100. [Repealed] |
Section 101. General permit requirements for low hazard potential impounding structures |
Section 102. Registering for coverage under the general permit for low hazard potential impounding structures |
Section 103. Transitioning from regular or conditional certificates to general permit coverage for low hazard potential impounding structures |
Section 104. Maintaining general permit coverage for low hazard potential impounding structures |
Section 105. Regular Operation and Maintenance Certificates |
Section 110. [Repealed] |
Section 120. [Repealed] |
Section 125. Delayed effective date for Spillway Design Flood requirements for impounding structures |
Section 130. [Repealed] |
Section 140. [Repealed] |
Section 150. Conditional operation and maintenance certificate |
Section 155. Extension of Operation and Maintenance Certificates |
Section 160. Additional operation and maintenance requirements |
Section 165. Agricultural exemption |
Section 170. Transfer of certificates |
Section 175. Emergency Action Plan (EAP) for High and Significant Hazard Potential impounding structures |
Section 177. Emergency Preparedness Plan for Low Hazard impounding structures |
Section 180. Inspections |
Section 190. Right to informal fact-finding proceeding or hearing |
Section 195. Judicial review |
Section 200. Enforcement |
Section 210. Consulting committee |
Section 220. Unsafe conditions |
Section 230. Complaints |
Section 240. Design of structures |
Section 250. [Repealed] |
Section 260. Spillway design |
Section 270. Principal spillways and outlet works |
Section 280. Drain requirements |
Section 290. Life of the impounding structure |
Section 300. Additional design requirements |
Section 310. Plans and specifications |
Section 320. Acceptable design procedures and references |
Section 330. Other applicable dam safety references |
Section 340. Authority to establish fees |
Section 350. Fee submittal procedures |
Section 360. Fee exemptions |
Section 370. Construction Permit application fees |
Section 375. Fee for coverage under the general permit for low hazard impounding structures |
Section 380. Regular Operation and Maintenance Certificate application fees |
Section 390. Conditional Operation and Maintenance Certificate application fees |
Section 395. Simplified dam break inundation zone analysis fee |
Section 400. Incremental Damage Analysis review fees |
Appendix 9999. DOCUMENTS INCORPORATED BY REFERENCE (4VAC50-20) |