Section 130. Base fee rate schedules  


Latest version.
  • TABLE 4.1. BASE FEE RATES FOR ANNUAL WASTE MANAGEMENT FACILITY FEES.

    Category of Facility/Activity

    Base Fee Rate

    1. Sanitary landfills, noncaptive industrial landfills, and construction and demolition landfills are assigned a base fee rate as follows:

    Sanitary landfill

    $0.115 per ton of waste landfilled

    Construction, demolition, debris landfill

    $0.115 per ton of waste landfilled

    Noncaptive industrial landfill

    $0.115 per ton of waste landfilled

    2. Incinerators and energy recovery facilities are assigned a base fee rate based upon their annual tonnage as follows:

    Base Fee Rate

    Incinerators

    $0.055 per ton of waste incinerated

    Energy recovery facilities

    $0.055 per ton of waste incinerated

    3. Other types of facilities are assigned a base fee rate as follows:

    Type of Facility/Activity

    Base Fee Rate

    Composting

    $1,200

    Regulated medical waste

    $2,500

    Materials recovery

    $4,500

    Transfer station

    $5,500

    Facilities in post-closure care

    $1,000

    4. Active captive industrial landfills are assigned a base fee rate as follows:

    Type of Facility/Activity

    Base Fee Rate

    Small landfills (landfilling less than 100,000 tons per year)

    $2,500

    Large landfills (landfilling 100,000 tons or more per year)

    $7,500

Historical Notes

Derived from Volume 20, Issue 23, eff. July 1, 2004; amended, Virginia Register Volume 26, Issue 23, eff. August 18, 2010; Volume 27, Issue 22, eff. August 3, 2011.

Statutory Authority

§ 10.1-1402 of the Code of Virginia.