Section 120. Permit application fee schedules  


Latest version.
  • TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION.

    TYPE OF FACILITY

    FEE

    All landfills:

    Part A application

    $4,180

    Part B application

    $18,680

    Incineration/Energy Recovery Facility

    $5,880

    Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage Facility, or Regulated Medical Waste Treatment Facility

    $4,310

    Compost Facility

    Facilities Processing Category I Waste

    $6,850

    Facilities Processing Waste Categories I, II, or III, or Categories III and Lower

    $10,550

    Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower

    $12,670

    Experimental Solid Waste Facility

    $2,090

    Permit-by-rule Initial Review and Confirmation

    $390

    Emergency Permit

    $2,310

    TABLE 3.1‑2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.

    TYPE OF PERMIT MODULE

    FEE

    Landfill Part A

    $4,180

    General - Module I

    $390

    Facility - Module II

    $1,310

    Landfill - Module III, IV, or V

    $7,050

    Design plan review

    $910

    Liner design review

    $1,960

    Leachate system review

    $1,310

    Gas management plan review

    $1,700

    Drainage plan review

    $910

    Cover design review

    $1,830

    Equipment

    $390

    Compost facility - Module VI

    $3,660

    Design plan review

    $650

    Liner design review

    $1,310

    Leachate system review

    $910

    Drainage plan review

    $650

    Equipment

    $390

    Transfer station - Module VII

    $1,180

    Material recovery facility - Module VIII

    $1,570

    Waste supply analysis

    $650

    Waste management areas

    $520

    Wastewater management areas

    $390

    Incinerator/Energy recovery facility - Module IX

    $3,000

    Waste and residue storage

    $910

    Operational requirements

    $1,570

    Waste control procedures

    $520

    Groundwater monitoring - Module X or XI

    $3,260

    Well placement

    $1,310

    Materials and specifications

    $390

    Sampling plan

    $1,570

    Closure - Module XII

    $390

    Post-closure - Module XIII

    $390

    Corrective action - Module XIV

    $3,000

    Leachate handling Module XV

    $1,310

    Regulated medical waste storage facility - Module XVI

    $390

    Regulated medical waste treatment facility - Module XVII

    $390

    Permit-by-rule Modification Review and Confirmation

    $390

    Public participation (does not include costs of newspaper advertisements or radio broadcasts)

    $1,040

    TABLE 3.1-3. VARIANCE REQUESTS.

    TYPE OF VARIANCE

    FEE

    Base fee for all variances

    $390

    Supplemental fees based on variance type

    Exemption from classification as a solid waste

    $520

    Variance to permitting requirements

    Siting requirements

    $520

    Facility design (other than alternate liner design)

    $520

    Operational requirements

    --

    Groundwater monitoring (other than groundwater protection standards and location of monitoring system)

    $920

    Closure requirements

    --

    Post-closure requirements

    --

    Groundwater Protection Standards

    --

    Alternate liner system design

    $1,570

    Location of groundwater monitoring system

    $920

Historical Notes

Derived from Volume 19, Issue 18, eff. July 1, 2003; amended, Virginia Register Volume 20, Issue 23, eff. July 1, 2004; Volume 29, Issue 21, eff. August 1, 2013.

Statutory Authority

§ 10.1-1402 of the Code of Virginia.