Virginia Administrative Code (Last Updated: January 10, 2017) |
Title 9. Environment |
Agency 20. Virginia Waste Management Board |
Chapter 90. Solid Waste Management Permit Action Fees and Annual Fees |
Section 120. Permit application fee schedules
-
TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION.
TYPE OF FACILITY
FEE
All landfills:
Part A application
$4,180
Part B application
$18,680
Incineration/Energy Recovery Facility
$5,880
Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage Facility, or Regulated Medical Waste Treatment Facility
$4,310
Compost Facility
Facilities Processing Category I Waste
$6,850
Facilities Processing Waste Categories I, II, or III, or Categories III and Lower
$10,550
Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower
$12,670
Experimental Solid Waste Facility
$2,090
Permit-by-rule Initial Review and Confirmation
$390
Emergency Permit
$2,310
TABLE 3.1‑2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.
TYPE OF PERMIT MODULE
FEE
Landfill Part A
$4,180
General - Module I
$390
Facility - Module II
$1,310
Landfill - Module III, IV, or V
$7,050
Design plan review
$910
Liner design review
$1,960
Leachate system review
$1,310
Gas management plan review
$1,700
Drainage plan review
$910
Cover design review
$1,830
Equipment
$390
Compost facility - Module VI
$3,660
Design plan review
$650
Liner design review
$1,310
Leachate system review
$910
Drainage plan review
$650
Equipment
$390
Transfer station - Module VII
$1,180
Material recovery facility - Module VIII
$1,570
Waste supply analysis
$650
Waste management areas
$520
Wastewater management areas
$390
Incinerator/Energy recovery facility - Module IX
$3,000
Waste and residue storage
$910
Operational requirements
$1,570
Waste control procedures
$520
Groundwater monitoring - Module X or XI
$3,260
Well placement
$1,310
Materials and specifications
$390
Sampling plan
$1,570
Closure - Module XII
$390
Post-closure - Module XIII
$390
Corrective action - Module XIV
$3,000
Leachate handling Module XV
$1,310
Regulated medical waste storage facility - Module XVI
$390
Regulated medical waste treatment facility - Module XVII
$390
Permit-by-rule Modification Review and Confirmation
$390
Public participation (does not include costs of newspaper advertisements or radio broadcasts)
$1,040
TABLE 3.1-3. VARIANCE REQUESTS.
TYPE OF VARIANCE
FEE
Base fee for all variances
$390
Supplemental fees based on variance type
Exemption from classification as a solid waste
$520
Variance to permitting requirements
Siting requirements
$520
Facility design (other than alternate liner design)
$520
Operational requirements
--
Groundwater monitoring (other than groundwater protection standards and location of monitoring system)
$920
Closure requirements
--
Post-closure requirements
--
Groundwater Protection Standards
--
Alternate liner system design
$1,570
Location of groundwater monitoring system
$920
Historical Notes
Derived from Volume 19, Issue 18, eff. July 1, 2003; amended, Virginia Register Volume 20, Issue 23, eff. July 1, 2004; Volume 29, Issue 21, eff. August 1, 2013.
Statutory Authority
§ 10.1-1402 of the Code of Virginia.