Virginia Administrative Code (Last Updated: January 10, 2017) |
Title 12. Health |
Agency 5. Department of Health |
Chapter 630. Private Well Regulations |
Section 272. Issuance of express geothermal well construction permit, inspection and final approval.
-
A. Issuance of the express geothermal well permit. Upon receipt of a complete registration statement and the appropriate fee, the department will acknowledge receipt of the registration statement and issue the permit with a copy given to the contractor. The construction of the geothermal heating system may begin immediately upon submission of a complete registration statement and counter-signature denoting receipt by the department.
B. Inspection. The department, at its sole discretion, may inspect the closed-loop geothermal well any time after acceptance of the registration statement until after the installation is approved. If, upon inspection of the well, it is found that the well location does not comply with the minimum separation distances or any other provision of this chapter, no inspection statement shall be issued until the deficiencies have been corrected.
C. Final approval. Upon receipt of the Uniform Water Well Completion Report, as required in 12VAC5-630-440, and completion of any inspections deemed necessary to ensure compliance with this chapter, or unless the department has evidence to indicate that the well is not in compliance with the requirements of this chapter, the local health department will provide the owner with a statement that the wells are approved for use.
Historical Notes
Derived from Volume 28, Issue 22, eff. August 16, 2012.
Statutory Authority
§ 32.1-176.4 of the Code of Virginia.