Section 271. Express geothermal well permits.  


Latest version.
  • A. The issuance of an express geothermal permit is contingent upon proper registration and payment of application fees and applies to the construction of wells used solely for a closed-loop geothermal heating system.

    B. A single application and a single fee are required for any geothermal well system. The fee is the same as for a single private well. A registration statement for closed loop construction permitting shall be made on a form provided and approved by the division. The registration shall include the following information:

    1. The property owner's name, address, and telephone number;

    2. The address of and directions to the property;

    3. The proposed use of the well;

    4. The name, address, telephone number, and contractor license number of the well driller;

    5. A statement signed by the property owner granting the department access to the site for the purpose of inspecting the property and the well during and after the well installation until the well is approved by the department or any required corrections are made;

    6. A site plan, drawn to scale, showing the proposed well site or sites, property boundaries, recorded easements, and accurate locations of actual or proposed sources of contamination (including but not limited to those listed in Table 3.1 of 12VAC5-630-380) within 100 feet of the proposed well site or sites; and

    7. A statement signed by the licensed well driller that the location and construction of the well or wells will comply with the requirements of this chapter.

    C. A single application fee is required for any geothermal well system, regardless of the number of wells included in the system. The fee is the same as for a single private well.

Historical Notes

Derived from Volume 28, Issue 22, eff. August 16, 2012.

Statutory Authority

§ 32.1-176.4 of the Code of Virginia.