20VAC5-330 Limitations on Disconnection of Electric and Water Service  

  • REGULATIONS
    Vol. 27 Iss. 24 - August 01, 2011

    TITLE 20. PUBLIC UTILITIES AND TELECOMMUNICATIONS
    STATE CORPORATION COMMISSION
    Chapter 330
    Proposed Regulation

    Title of Regulation: 20VAC5-330. Limitations on Disconnection of Electric and Water Service (adding 20VAC5-330-10 through 20VAC5-330-50).

    Statutory Authority: § 12.1-13 of the Code of Virginia.

    Public Hearing Information: A public hearing will be scheduled upon request.

    Public Comment Deadline: August 16, 2011.

    Agency Contact: Timothy R. Faherty, Manager, Consumer Services, Energy Division, State Corporation Commission, P.O. Box 1197, Richmond, VA 23218, telephone (804) 371-9629, FAX (804) 371-9350, or email tim.faherty@scc.virginia.gov.

    Summary:

    These proposed regulations required by Chapters 500, 662, and 673 of the 2011 Acts of Assembly establish limitations on the authority of an investor owned electric utility, electric cooperative, or public utility providing water service to terminate electric service or water service to the residence of any customer who provides the certification of a licensed physician that the customer or a family member who resides with the customer has a serious medical condition. These proposed regulations also provide a cost recovery mechanism under which electric and water utilities are authorized to recover any losses on customer accounts that are written off or otherwise determined to be uncollectible as a result of these regulations.

    AT RICHMOND, JULY 11, 2011

    COMMONWEALTH OF VIRGINIA, ex rel.

    STATE CORPORATION COMMISSION

    CASE NO. PUE-2011-00060

    Ex Parte: In re: Establishing rules providing limitations
    on disconnection of electric and water service for persons
    with serious medical conditions

    ORDER FOR NOTICE AND COMMENT

    This Order initiates a rulemaking required by Chapters 500, 662, and 673 of the 2011 Acts of Assembly ("Acts"). Through these Acts, the Virginia General Assembly has directed the State Corporation Commission ("Commission"), in order to promote public health and safety, to conduct a proceeding for the purpose of establishing limitations on the authority of an investor-owned electric utility, electric cooperative, or public utility providing water service to terminate electric service or water service to the residence of any customer who provides the certification of a licensed physician that the customer, or a family member who resides with the customer, has a serious medical condition. The Acts, inter alia, direct the Commission to: (i) establish limitations that are consistent with the public interest; (ii) establish a cost recovery mechanism under which electric and water utilities shall be authorized to recover any losses on customer accounts that are written off or otherwise determined to be uncollectible as a result of these regulations; and (iii) make these regulations effective no later than October 31, 2011. Finally, the Acts provide that in the proceeding establishing these regulations, the Commission shall consult with the Commissioner of Health, the Commissioner of Social Services, the Virginia Poverty Law Center, the Virginia League of Social Services Executives, electric utilities, water utilities, and other persons the Commission deems appropriate ("Designated Entities").

    At our direction, the Staff of the Commission ("Staff") has conferred informally with representatives of the Designated Entities. The Staff has prepared proposed rules implementing the regulations required by the Acts ("Proposed Rules"), which are attached hereto.

    NOW THE COMMISSION, upon consideration of the foregoing, is of the opinion and finds that a rulemaking proceeding should be initiated for the purpose of establishing rules of the Commission governing limitations on disconnection of water and electric service for persons with serious medical conditions. We find that the Designated Entities and any other persons or entities should be afforded notice and an opportunity to comment formally on the Proposed Rules, to request a hearing thereon, or to propose modifications or supplements to the Proposed Rules. We further find that a copy of the Proposed Rules should be sent to the Registrar of Regulations for publication in the Virginia Register.

    Accordingly, IT IS ORDERED THAT:

    (1) This matter is docketed and assigned Case No. PUE-2011-00060.

    (2) The Commission's Division of Information Resources shall forward a copy of this Order for Notice and Comment, including a copy of the Proposed Rules, to the Registrar of Regulations for publication in the Virginia Register.

    (3) A downloadable version of this Order and the Proposed Rules shall be available for access by the public on the Commission's website: http://www.scc.virginia.gov/case. A copy of this Order and the Proposed Rules shall be available for public inspection at the Commission's Document Control Center, Tyler Building, First Floor, 1300 East Main Street, Richmond, Virginia 23219, Monday through Friday, 8:15 a.m. to 5:00 p.m., excluding holidays.

    (4) On or before August 1, 2011, the Commission's Division of Information Resources shall publish the following notice as classified advertising in newspapers of general circulation throughout the Commonwealth of Virginia:

    NOTICE TO THE PUBLIC OF A PROCEEDING TO ESTABLISH RULES OF THE STATE CORPORATION COMMISSION PROVIDING LIMITATIONS ON DISCONNECTION OF ELECTRIC AND WATER SERVICE FOR PERSONS WITH SERIOUS MEDICAL CONDITIONS

    The Virginia General Assembly, through Chapters 500, 662, and 673 of the 2011 Acts of Assembly ("Acts"), has directed the State Corporation Commission ("Commission"), in order to promote public health and safety, to conduct a proceeding for the purpose of establishing limitations on the authority of an investor-owned electric utility, electric cooperative, or public utility providing water service to terminate electric service or water service to the residence of any customer who provides the certification of a licensed physician that the customer, or a family member who resides with the customer, has a serious medical condition.

    The Commission has initiated a proceeding to establish regulations in accordance with the Virginia General Assembly's directive. The Staff of the Commission has prepared proposed rules on disconnection of electric and water service ("Proposed Rules"). The Commission has issued an Order for Notice and Comment that provides, inter alia, that notice be given to the public and that interested persons be given an opportunity to file written comments on, to propose modifications or supplements to, or to request a hearing on these Proposed Rules.

    Copies of the Commission's Order and the Proposed Rules are available for public inspection at the Commission's Document Control Center, Tyler Building, First Floor, 1300 East Main Street, Richmond, Virginia, 23219, Monday through Friday 8:15 a.m. to 5:00 p.m., excluding holidays. Interested persons may also download unofficial copies from the Commission's website: http://www.scc.virginia.gov/case.

    On or before August 16, 2011, any interested person may file written comments on, propose modifications or supplements to, or request a hearing on the Proposed Rules by filing such comments, proposals, or hearing request with Joel H. Peck, Clerk, State Corporation Commission, c/o Document Control Center, P.O. Box 2118, Richmond, Virginia 23218-2118. Any interested person desiring to submit comments electronically may do so by following the instructions on the Commission's website: http://www.scc.virginia.gov/case. All correspondence shall refer to Case No. PUE-2011-00060.

    STATE CORPORATION COMMISSION

    (5) On or before August 16, 2011, any interested person or entity, including any of the Designated Entities, may comment on, propose modifications or supplements to, or request a hearing on the Proposed Rules by filing comments, proposals, or hearing requests with Joel H. Peck, Clerk, State Corporation Commission, c/o Document Control Center, P.O. Box 2118, Richmond, Virginia 23218-2118. Interested persons desiring to submit comments electronically may do so by following the instructions on the Commission's website: http://www.scc.virginia.gov/case. All correspondence shall refer to Case No. PUE-2011-00060.

    (6) The Staff may file a report with the Clerk of the Commission on or before August 30, 2011, concerning comments submitted to the Commission addressing the Proposed Rules.

    (7) This matter is continued pending further order of the Commission.

    AN ATTESTED COPY hereof shall be sent by the Clerk of the Commission to all persons on the official Service List in this matter. The Service List is available from the Clerk of the Commission, c/o Document Control Center, 1300 East Main Street, First Floor, Tyler Building, Richmond, Virginia 23219. A copy hereof shall be delivered to the Commission's Office of General Counsel and Divisions of Energy Regulation and Public Utility Accounting.

    CHAPTER 330
    LIMITATIONS ON DISCONNECTION OF ELECTRIC AND WATER SERVICE

    20VAC5-330-10. Applicability and scope.

    This chapter is promulgated pursuant to Chapters 500, 662, and 673 of the 2011 Acts of Assembly. The provisions in this chapter apply to investor-owned electric utilities, electric cooperatives, and public utilities providing water service. In order to promote public health and safety, this chapter is designed to establish reasonable limitations, consistent with the public interest, on the ability of investor-owned electric utilities, electric cooperatives, and public utilities providing water service to terminate service to residential customers who have a serious medical condition or to residential customers who reside with a family member with a serious medical condition and to provide such residential customers adequate time prior to the termination of electric or water service to either enter into a payment plan with the utility or make other arrangements for housing or medical care. Nothing in this chapter shall be interpreted to require an investor-owned electric utility, electric cooperative, or public utility providing water service to terminate service after the expiration of the timelines established herein.

    20VAC5-330-20. Definitions.

    The following terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:

    "Licensed physician" means a person licensed to practice medicine or osteopathic medicine (M.D. or D.O.) in any of the 50 states or the District of Columbia.

    "Serious medical condition" means a physical or psychiatric condition that requires medical intervention to prevent further disability, loss of function, or death. Such conditions are characterized by a need for ongoing medical supervision or the consultation of a physician. A serious medical condition carries with it a risk to health beyond that experienced by the majority of children and adults in their day-to-day minor illnesses and injuries. Individuals with a serious medical condition may require administration of specialized treatments and may be dependent on medical technology such as ventilators, dialysis machines, enteral or parenteral nutrition support, or continuous oxygen. Medical interventions may include medications with special storage requirements, use of powered equipment, or access to water. Further, a medical condition shall only be considered a serious medical condition if a licensed physician certifies that electric or water service is necessary in the treatment of the medical condition.

    "Serious Medical Condition Certification Form" means a written document, approved by the State Corporation Commission, signed by (i) a licensed physician, (ii) the customer, and (iii) the patient or the patient's legal guardian or power of attorney. The Serious Medical Condition Certification Form shall (i) identify the medical condition of the customer or family member who resides with the customer, (ii) include a certification by a licensed physician that the medical condition meets the definition of a serious medical condition, (iii) identify the anticipated length of time that the serious medical condition will persist, and (iv) identify any equipment prescribed or treatment required for the medical condition.

    20VAC5-330-30. General provisions.

    A. A request for a waiver of any of the provisions of this chapter shall be considered by the State Corporation Commission on a case-by-case basis, and may be granted upon such terms and conditions as the State Corporation Commission may impose.

    B. An investor-owned electric utility, electric cooperative, or public utility providing water service shall use the Serious Medical Condition Certification Form (Form SMCC) provided on the State Corporation Commission's website at http://www.scc.virginia.gov/pue/rules.aspx unless the State Corporation Commission approves the use of an alternative form.

    C. An investor-owned electric utility, electric cooperative, or public utility providing water service may require a customer to provide it a new Serious Medical Condition Certification Form either annually or upon the expiration of the anticipated length of time that the serious medical condition will persist if such time is less than 12 months.

    D. An investor-owned electric utility, electric cooperative, or public utility providing water service may take reasonable actions to verify the validity of the Serious Medical Condition Certification Form. Such actions include, but are not limited to, contacting (i) the licensed physician to confirm the medical condition of the patient and the treatment or treatments associated therewith; (ii) the Virginia Department of Health Professions, or the applicable state's licensing board, to verify that the physician is a licensed physician; or (iii) the customer to verify that the patient currently resides at the residence.

    E. In the event that the investor-owned electric utility, electric cooperative, or public utility providing water service is of the opinion that the information provided on the Serious Medical Condition Certification Form is invalid, or otherwise is of the opinion that there has been fraud or abuse of the process provided in this chapter, it may petition the State Corporation Commission for redress pursuant to 5VAC5-20-100 B, State Corporation Commission's Rules of Practice and Procedure.

    20VAC5-330-40. Limitations on service termination to residential customers.

    A. Following the issuance of a notice of intent to terminate service pursuant to § 56-247.1 D or F of the Code of Virginia, an investor-owned electric utility, electric cooperative, or public utility providing water service shall, upon request from a residential customer who has a Serious Medical Condition Certification Form filed with the utility, delay termination of service for a minimum of an additional 30 calendar days beyond the expiration of the notice.

    B. Following the issuance of a notice of intent to terminate service pursuant to § 56-247.1 D or F of the Code of Virginia, an investor-owned electric utility, electric cooperative, or public utility providing water service shall, upon request from a residential customer who does not have a Serious Medical Condition Certification Form filed with the utility, delay termination of service for 10 calendar days upon oral or written notification from a residential customer that such customer or a family member residing with the customer has a serious medical condition. The 10-calendar day delay in service termination shall commence on the date the investor-owned electric utility, electric cooperative, or public utility providing water service receives notification. At the time of such notification, the investor-owned electric utility, electric cooperative, or public utility providing water service shall:

    1. Advise the residential customer that service termination will be delayed for 10 calendar days pending receipt of the Serious Medical Condition Certification Form;

    2. Provide the customer access to the Serious Medical Condition Certification Form via its website;

    3. Not later than the next business day, mail, email, or deliver via facsimile transmission a copy of the Serious Medical Condition Certification Form upon a request from the customer; and

    4. Not later than the next business day, mail the customer a letter advising the customer:

    a. The date notification was received;

    b. The date that the 10-calendar day delay expires; and

    c. That upon receipt of a Serious Medical Condition Certification Form within the 10-calendar day time period provided for in this subsection, it will delay the termination of service 30 calendar days from the date of termination initially noticed.

    Upon receipt of a Serious Medical Condition Certification Form within the 10-calendar day time period provided for in this subsection, an investor-owned electric utility, electric cooperative, or public utility providing water service shall provide the 30-calendar day delay in termination of service required in subsection A of this section.

    C. In the event an investor-owned electric utility, electric cooperative, or public utility providing water service has terminated service to a residential customer within the preceding 14 calendar days, the investor-owned electric utility, electric cooperative, or public utility providing water service shall promptly restore service upon (i) receipt of a Serious Medical Condition Certification Form, or confirmation of such a form on file; and (ii) a request from the customer to reconnect service. The investor-owned electric utility, electric cooperative, or public utility providing water service shall not be permitted to require any payment as a condition to reconnect; however, it may charge the customer, on the next monthly bill, any applicable reconnection fees that are on file in its State Corporation Commission approved tariffs and terms and conditions of service. Following the reconnection of service, the investor-owned electric utility, electric cooperative, or public utility providing water service shall delay termination of service for a minimum of 30 calendar days from the date it reconnects the customer.

    D. An investor-owned electric utility, electric cooperative, or public utility providing water service shall permit a residential customer to delay termination of service under this chapter two times within a 12-month period. The 30-calendar day delays may be consecutive. Nothing in this chapter shall prohibit an investor-owned electric utility, electric cooperative, or public utility providing water service from providing to a customer additional delay from the termination of service beyond the delay required.

    E. During the delay in service termination pursuant to subsections A and C of this section, the investor-owned electric utility, electric cooperative, or public utility providing water service shall:

    1. In the event the investor-owned electric utility, electric cooperative, or public utility providing water service is able to establish payment arrangements with the customer, mail to the customer a letter detailing the agreement not later than three business days after the agreement on payment arrangements is made; or

    2. In the event the investor-owned electric utility, electric cooperative, or public utility providing water service is unable to establish payment arrangements with the customer, mail the customer a letter, not later than 10 calendar days prior to the expiration of the 30-calendar day delay required by this chapter, advising the customer of (i) the date that service may be terminated and (ii) any payment arrangements available to the customer. The letter shall also advise the customer of his right to delay service termination pursuant to this chapter twice within a 12-month period.

    F. The investor-owned electric utility, electric cooperative, or public utility providing water service shall (i) maintain a copy of any letters required under this section for a minimum of 12 months and (ii) provide such copies to the State Corporation Commission's Division of Energy Regulation upon request.

    20VAC5-330-50. Cost recovery mechanism.

    A. An investor-owned electric utility, electric cooperative, or public utility providing water service shall be permitted to recover losses on customer accounts resulting from the implementation of this chapter in the same manner as other uncollectable costs are recovered through rates.

    B. An investor-owned electric utility, electric cooperative, or public utility providing water service shall maintain write-offs and recoveries of uncollectable accounts in such a manner that would allow those amounts written off as a result of the implementation of this chapter to be separately identified.

    NOTICE: The following form used in administering the regulation was filed by the agency. The form is not being published; however, online users of this issue of the Virginia Register of Regulations may click on the name to access the form. The form is also available through the agency contact or at the Office of the Registrar of Regulations, General Assembly Building, 2nd Floor, Richmond, Virginia 23219.

    FORMS (20VAC5-330)

    Serious Medical Condition Certification Form, Form SMCC (10/11).

    VA.R. Doc. No. R11-2908; Filed July 11, 2011, 2:49 p.m.