Section 50. General authorization; conditions requiring a new source review permit  


Latest version.
  • A. A biomass pilot test facility desiring authority to construct and test under the general permit shall comply with the requirements of the general permit, may be subject to applicable requirements of 9VAC5-80 (Permits for Stationary Sources), and shall register with the department as required under 9VAC5-20-160.

    B. A biomass pilot test facility may continue to operate under the terms and conditions set forth in 9VAC5-520-180 J 2 provided the test results demonstrate the emissions are below the permit emission threshold limits of 9VAC5-520-170 and the facility is exempt from the minor source permitting requirements.

    C. No general permit for a biomass pilot test facility will be issued until the department has received a submission that the facility is not a major source subject to the provisions of Article 1, 3, 7, 8, or 9 of Part II of 9VAC5-80 (Permits for Stationary Sources). Each submission shall include the following statement by the permittee or authorized representative: "I am authorized to make this submission on behalf of the owners and operators of the biomass pilot test facility for which the submission is made. I certify under penalty of law that the statements and information submitted in this document and all its attachments were prepared in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I certify, based on my knowledge of the biomass pilot test facility and the attached mathematical or engineering demonstration or both, that the facility is not a major source, is not located at a major source defined in this chapter, or is not subject to § 129 of the federal Clean Air Act. If information demonstrates that the facility is subject to the provisions of Article 1, 3, 7, 8, or 9 of Part II of 9VAC5-80 (Permits for Stationary Sources) or § 129 of the federal Clean Air Act, the facility will stop operation immediately. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment."

    D. The department may require a permittee that is authorized to construct and test under this general permit to apply for and obtain a minor NSR permit. Any interested person may request the board to take action under this subsection. Cases where an individual minor NSR permit may be required include the following:

    1. The emissions are above the permit emission threshold limits of 9VAC5-520-170 for either criteria pollutants or hazardous air pollutants;

    2. Circumstances have changed since the time of the request to be authorized to be exempt from permitting so that the emissions are no longer appropriately controlled under the terms and conditions of the exemption letter;

    3. Either a temporary or permanent reduction or elimination of the emissions is necessary; or

    4. Other relevant factors.

    E. Permits may be required on a case-by-case basis. A biomass pilot test facility subject to an individual minor NSR permit according to 9VAC5-520-180 shall be notified of that decision and the reasons for it. The permittee must apply for a permit within 30 days of notice and is subject to the provisions of 9VAC5-520-180 J 3 a and b and 9VAC5-80 (Permits for Stationary Sources).

    F. Any permittee authorized by a general permit may request to be excluded from the coverage of the general permit by applying for an individual minor new source review permit. The permittee shall submit an application as required by 9VAC5-80 (Permits for Stationary Sources).

    G. When an individual minor NSR permit is issued to a permittee, coverage under the general permit is automatically terminated on the effective date of the minor NSR permit.

Historical Notes

Derived from Volume 27, Issue 17, eff. May 25, 2011.

Statutory Authority

§ 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.