Section 120. Required information for modifications and relocations  


Latest version.
  • The following information is required prior to modification of a facility or relocation of an emission unit:

    1. The permittee shall provide written notification to the regional director, including a revised spreadsheet and a plant layout or flow diagram each time equipment is installed at a facility. The notification shall be submitted at least 15 days before the equipment is installed at the facility unless otherwise approved by the regional director.

    2. The permittee shall provide written notification to the regional director, including a revised spreadsheet and a plant layout or flow diagram, each time an emissions unit is relocated. This notification shall be submitted within 15 days of the date the emissions unit leaves the facility, unless otherwise approved by the regional director.

Historical Notes

Derived from Volume 19, Issue 03, eff. December 1, 2002.

Statutory Authority

§ 10.1-1308 of the Code of Virginia.