Section 90. CTC application  


Latest version.
  • All applications for a CTC shall be submitted on a form provided by the department and shall be submitted by the owner or authorized agent to the appropriate area engineer as specified at least 30 days of the time an owner desires to be notified of the required procedure for issuance of a CTC, or at least 180 days prior to the date that the owner desires to begin construction. An application for a CTC or a sewerage system shall be accompanied by notification that local government will issue necessary approvals and design data verifying that downstream capacity is available to adequately convey and treat the design flows in accordance with these regulations. An application for a CTC for a sewerage system or treatment works will not be considered complete until evidence is submitted that a complete application has been submitted for a VPDES permit or VPA permit. The owner will be notified by the department within 30 days of receipt of a complete application if a technical evaluation of preliminary or final design documents is required following the preliminary engineering conference, if held.

Historical Notes

Former 12VAC5-581-140 derived from Volume 18, Issue 10, eff. February 27, 2002; amended and adopted as 9VAC25-790-90, Virginia Register Volume 20, Issue 09, eff. February 12, 2004.

Statutory Authority

§ 62.1-44.19 of the Code of Virginia.