Virginia Administrative Code (Last Updated: January 10, 2017) |
Title 9. Environment |
Agency 25. State Water Control Board |
Chapter 210. Virginia Water Protection Permit Program Regulation |
Section 90. Conditions applicable to all VWP permits
-
A. Duty to comply. The permittee shall comply with all conditions and limitations of the VWP permit. Nothing in this chapter shall be construed to relieve the permittee of the duty to comply with all applicable federal and state statutes, regulations, toxic standards, and prohibitions. Any VWP permit violation or noncompliance is a violation of the Clean Water Act and State Water Control Law and is grounds for enforcement action, VWP permit termination, VWP permit revocation, VWP permit modification, or denial of an application for a VWP permit extension or reissuance.
B. Duty to cease or confine activity. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the activity for which a VWP permit has been granted in order to maintain compliance with the conditions of the VWP permit.
C. Duty to mitigate. The permittee shall take all reasonable steps to minimize or prevent any impacts in violation of the VWP permit that may have a reasonable likelihood of adversely affecting human health or the environment.
D. Inspection and entry. Upon presentation of credentials, the permittee shall allow the board or any duly authorized agent of the board, at reasonable times and under reasonable circumstances, to conduct the actions listed in this section. For the purpose of this section, the time for inspection shall be deemed reasonable during regular business hours. Nothing contained herein shall make an inspection time unreasonable during an emergency.
1. Enter upon permittee's property, public or private, and have access to, inspect and copy any records that must be kept as part of the VWP permit conditions;
2. Inspect any facilities, operations or practices (including monitoring and control equipment) regulated or required under the VWP permit; and
3. Sample or monitor any substance, parameter, or activity for the purpose of ensuring compliance with the conditions of the VWP permit or as otherwise authorized by law.
E. Duty to provide information. Plans, maps, conceptual reports, and other relevant information shall be submitted as required by the board prior to commencing construction.
F. Monitoring and records requirements.
1. Monitoring of parameters, other than pollutants, shall be conducted according to approved analytical methods as specified in the VWP permit. Analysis of pollutants will be conducted according to 40 CFR Part 136 (2000), Guidelines Establishing Test Procedures for the Analysis of Pollutants.
2. Samples and measurements taken for the purpose of monitoring shall be representative of the monitored activity.
3. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart or electronic recordings for continuous monitoring instrumentation, copies of all reports required by the VWP permit, and records of all data used to complete the application for the VWP permit, for a period of at least three years from the date of permit expiration. This period may be extended by request of the board at any time.
4. Records of monitoring information shall include as appropriate:
a. The date, exact place and time of sampling or measurements;
b. The name of the individuals who performed the sampling or measurements;
c. The date and time the analyses were performed;
d. The name of the individuals who performed the analyses;
e. The analytical techniques or methods supporting the information such as observations, readings, calculations and bench data used;
f. The results of such analyses; and
g. Chain of custody documentation.
G. Duty to reapply. Any permittee desiring to continue a previously permitted activity after the expiration date of the VWP permit shall apply for and obtain a new permit or, if applicable, shall request an extension in accordance with 9VAC25-210-180.
Historical Notes
Derived from VR680-15-02 § 2.2, eff. May 20, 1992; amended, Volume 17, Issue 21, eff. August 1, 2001; Volume 23, Issue 21, eff. July 25, 2007; Volume 32, Issue 21, eff. August 2, 2016.
Statutory Authority
§ 62.1-44.15 of the Code of Virginia; § 401 of the Clean Water Act (33 USC § 1251 et seq.).