Section 70. Registration statement  


Latest version.
  • A. Deadlines for submitting registration statement. Any owner seeking coverage under this general permit, and who is required to submit a registration statement, shall submit a complete general VPDES permit registration statement in accordance with this section, which shall serve as a notice of intent for coverage under the General VPDES Permit for Domestic Sewage Discharges of Less Than or Equal to 1,000 Gallons per Day. For an individual single family dwelling, the owner may submit a combined application in place of the registration statement.

    1. New treatment works. Any owner proposing a new discharge shall submit a complete registration statement, or for an individual single family dwelling a combined application, to the department at least 60 days prior to the date planned for commencing operation of the treatment works.

    2. Existing treatment works.

    a. Any owner of an existing treatment works covered by an individual VPDES permit who is proposing to be covered by this general permit shall notify the department and submit a complete registration statement, or for an individual single family dwelling a combined application, at least 240 days prior to the expiration date of the individual VPDES permit.

    b. Any owner of a treatment works that was authorized to discharge under the general permit issued in 2011, and who intends to continue coverage under this general permit, is automatically covered by this general permit and is not required to submit a registration statement, or for an individual single family dwelling a combined application, if:

    (1) The ownership of the treatment works has not changed since the registration statement or combined application for coverage under the 2011 general permit was submitted, or, if the ownership has changed (i) a new registration statement or combined application or (ii) VPDES Change of Ownership form was submitted to the department by the new owner at the time of the title transfer;

    (2) There has been no change in the design or operation, or both, of the treatment works since the registration statement or combined application for coverage under the 2011 general permit was submitted;

    (3) For treatment works serving individual single family dwellings, VDH has no objection to the automatic permit coverage renewal for this treatment works based on system performance issues, enforcement issues, or other issues sufficient to the board. If VDH objects to the automatic renewal for this treatment works, the owner will be notified by the board in writing; and

    (4) For treatment works serving buildings or dwellings other than individual single family dwellings, the board has no objection to the automatic permit coverage renewal for this treatment works based on system performance issues, enforcement issues, or other issues sufficient to the board. If the board objects to the automatic renewal for this treatment works, the owner will be notified by the board in writing.

    c. Any owner of a treatment works that was authorized to discharge under the general permit issued in 2011 that does not qualify for automatic permit coverage renewal shall submit a complete registration statement, or for an individual single family dwelling a combined application, to the department on or before June 2, 2016.

    3. Late registration statements. Registration statements, or for individual single family dwellings combined applications, for existing treatment works covered under subdivision 2 b of this subsection will be accepted after August 1, 2016, but authorization to discharge will not be retroactive. Owners described in subdivision 2 b of this subsection that submit registration statements or combined applications after June 2, 2016, are authorized to discharge under the provisions of 9VAC25-110-60 D if a complete registration statement, or combined application, is submitted before August 2, 2016.

    B. Registration statement. The registration statement shall contain the following information:

    1. a. Indicate if the building served by the treatment works is an individual single family dwelling. If the building is not an individual single family dwelling, describe the use of the building or site served.

    b. Name and street address of the building or site served by the treatment works.

    2. a. Name, mailing address, email address (where available), and telephone number of the owner of the treatment works. Indicate if the owner is or will be the occupant of the dwelling or building served by the treatment works.

    b. If the owner is not or will not be the occupant of the dwelling or building, provide an alternate contact name, mailing address, email address (where available), and telephone number of the dwelling or building, if available.

    3. Name of the water body receiving the discharge. Indicate if the discharge point is on a stream that usually flows during dry weather.

    4. The amount of discharge from the treatment works, in gallons per day, on a monthly average, and the design flow of the treatment works, in gallons per day.

    5. A description of any pollutants, other than domestic sewage, to be discharged.

    6. For a proposed treatment works, indicate if there are central sewage facilities available to serve the building or site.

    7. If the treatment works currently has a VPDES permit, provide the permit number. Indicate if the treatment works has been built and begun discharging.

    8. For the owner of any proposed treatment works or any treatment works that has not previously been issued a VPDES permit:

    a. A 7.5 minute U.S. Geological Survey (USGS) topographic map or equivalent (e.g., a computer generated map) that indicates the discharge point, the location of the property to be served by the treatment works, and the location of any wells, springs, other water bodies, and any residences within 1/2 mile downstream from the discharge point;

    b. A site diagram of the existing or proposed treatment works; to include the property boundaries, the location of the dwelling, building, or site served, the individual sewage treatment units, the receiving water body, and the discharge line location; and

    c. A copy of the notification from the Virginia Department of Health that an onsite sewage disposal system permit has been applied for and that the Virginia Department of Health has determined that there is no onsite system available to serve that parcel of land.

    9. Operation and maintenance.

    a. For the owner of a treatment works serving an individual single family dwelling, operation and maintenance requirements are specified in VDH regulations at 12VAC5-640-500;

    b. For the owner of a treatment works serving a building or dwelling other than an individual single family dwelling, indicate if a valid maintenance contract has been obtained, or if an exception to the maintenance contract requirement has been requested and granted in accordance with subdivision 10 of this subsection. Provide the name of the individual or company contracted to perform the treatment works maintenance and the expiration date of the current contract, if applicable. If the treatment works has not been constructed yet, provide the name after the certificate to construct (CTC) is issued, and prior to requesting a certificate to operate (CTO).

    10. The owner of a treatment works serving a building or dwelling other than an individual single family dwelling may request an exception to the maintenance contract requirement by submitting an operation and maintenance plan to the board for review and approval. If an operation and maintenance plan has been approved by the board previously and remains current and complete, then it does not need to be resubmitted. In such cases, the owner shall provide the date of approval of the operation and maintenance plan and identify any changes that have been made to the approved plan.

    11. The following certification: "I hereby grant to duly authorized agents of the Department of Environmental Quality, upon presentation of credentials, permission to enter the property where the treatment works is located for the purpose of determining compliance with or the suitability of coverage under the General Permit. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations."

    C. The registration statement shall be signed in accordance with 9VAC25-31-110 A of the VPDES Permit Regulation.

    D. The registration statement may be delivered to the department by either postal or electronic mail and shall be submitted to the DEQ regional office serving the area where the treatment works is located.

Historical Notes

Derived from VR680-14-09 § 7, eff. July 1, 1992; amended, Volume 12, Issue 19, eff. August 1, 1996; Volume 17, Issue 16, eff. August 1, 2001; Volume 17, Issue 21, eff. August 1, 2001; Volume 22, Issue 04, eff. November 30, 2005; Volume 27, Issue 12, eff. August 2, 2011; Volume 32, Issue 13, eff. August 2, 2016.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124.