Section 148. Virginia stormwater management program administrative requirements  


Latest version.
  • A. A VSMP shall provide for the following:

    1. Identification of the authority accepting complete registration statements and of the authorities completing plan review, plan approval, inspection, and enforcement;

    2. Submission and approval of erosion and sediment control plans in accordance with the Virginia Erosion and Sediment Control Law and attendant regulations and the submission and approval of stormwater management plans;

    3. Requirements to ensure compliance with 9VAC25-870-54, 9VAC25-870-55, and 9VAC25-870-56;

    4. Requirements for inspections and monitoring of construction activities by the operator for compliance with local ordinances;

    5. Requirements for long-term inspection and maintenance of stormwater management facilities;

    6. Collection, distribution to the state if required, and expenditure of fees;

    7. Enforcement procedures and civil penalties where applicable;

    8. Policies and procedures to obtain and release bonds, if applicable; and

    9. Procedures for complying with the applicable reporting and recordkeeping requirements in 9VAC25-870-126.

    B. A locality's VSMP authority shall adopt and enforce an ordinance(s) that incorporate(s) the components set out in subdivisions 1 through 5 and 7 of subsection A of this section. Other VSMP authorities shall provide supporting documentation that incorporates the components set out in subdivisions 1 through 5 of subsection A of this section in a format acceptable to the department.

Historical Notes

Former 4VAC50-60-148 derived from Volume 27, Issue 26, eff. September 13, 2011; amended, Virginia Register Volume 29, Issue 04, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 02, eff. October 23, 2013.

Statutory Authority

§§ 62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.