Section 130. General requirements for all petroleum and hazardous substance UST systems  


Latest version.
  • Part IV. Release Detection

    A. Owners and operators of new and existing UST systems must provide a method, or combination of methods, of release detection that:

    1. Can detect a release from any portion of the tank and the connected underground piping that routinely contains product;

    2. Is installed, calibrated, operated, and maintained in accordance with the manufacturer's instructions, including routine maintenance and service checks for operability or running condition; and

    3. Meets the performance requirements in 9VAC25-580-160 or 9VAC25-580-170, with any performance claims and their manner of determination described in writing by the equipment manufacturer or installer. In addition, methods used after December 22, 1990, except for methods permanently installed prior to that date, must be capable of detecting the leak rate or quantity specified for that method in subdivisions 2, 3, and 4 of 9VAC25-580-160 or subdivisions 1 and 2 of 9VAC25-580-170 with a probability of detection of 0.95 and a probability of false alarm of 0.05.

    B. When a release detection method operated in accordance with the performance standards in 9VAC25-580-160 or 9VAC25-580-170 indicates a release may have occurred, owners and operators must notify the board in accordance with Part V (9VAC25-580-190 et seq.) of this chapter.

    C. Owners and operators of all UST systems must comply with the release detection requirements of this part by December 22 of the year listed in the following table:

    SCHEDULE FOR PHASE-IN OF RELEASE DETECTION

    Year system was installed

    Year when release detection is required
    (by December 22 of the year indicated)

    1989

    1990

    1991

    1992

    1993

    Before 1965 or date unknown

    RD

    P

    1965-1969

    P/RD

    1970-1974

    P

    RD

    1975-1979

    P

    RD

    1980-1988

    P

    RD

    New tanks (after December 22, 1988) immediately upon installation.

    P = Must begin release detection for all pressurized piping in accordance with subdivision C 2 a of 9VAC25-580-140.

    RD = Must begin release detection for tanks and suction piping in accordance with subdivisions C 1 and C 2 b of 9VAC25-580-140, and 9VAC25-580-150.

    D. Any existing UST system that cannot apply a method of release detection that complies with the requirements of this part must complete the closure procedures in Part VII (9VAC25-580-310 et seq.) of this chapter by the date on which release detection is required for that UST system under subsection C of this section.

Historical Notes

Derived from VR680-13-02 § 4.1, eff. October 25, 1989; amended, Volume 20, Issue 12, eff. March 24, 2004; Volume 26, Issue 25, eff. September 15, 2010.

Statutory Authority

§§ 62.1-44.15 and 62.1-44.34:9 of the Code of Virginia; 40 CFR Parts 280 and 281.