Virginia Administrative Code (Last Updated: January 10, 2017) |
Title 9. Environment |
Agency 15. Department of Environmental Quality |
Chapter 60. Small Renewable Energy Projects (Solar) Permit by Rule |
Section 20. Authority and applicability
-
A. This regulation is issued under authority of Article 5 (§ 10.1-1197.5 et seq.) of Chapter 11.1 of Title 10.1 of the Code of Virginia. The regulation contains requirements for solar-powered electric generation projects consisting of PV systems and associated facilities with a single interconnection to the electrical grid that are designed for, or capable of, operation at a rated capacity equal to or less than 100 megawatts.
B. The department has determined that a permit by rule is required for small solar energy projects with a rated capacity greater than five megawatts and a disturbance zone greater than 10 acres, provided that the projects do not otherwise meet the criteria for Part III (9VAC15-60-130) of this chapter, and this regulation contains the permit by rule provisions for these projects in Part II (9VAC15-60-30 et seq.) of this chapter.
C. The department has determined that different provisions should apply to projects that meet the criteria as set forth in Part III (9VAC15-60-130) of this chapter, and this regulation contains the requirements, if any, for these projects in Part III (9VAC15-60-130 A and 9VAC15-60-130 B) of this chapter. Projects that meet the criteria for Part III of this chapter are deemed to be covered by the permit by rule.
D. The department has determined that small renewable energy projects utilizing other solar technologies shall fulfill all of the requirements in 9VAC15-40 as prescribed for small wind energy projects, unless (i) the owner or operator of the proposed project presents to the department information indicating that the other solar technology presents no greater likelihood of significant adverse impacts to natural resources than does PV technology and (ii) the department determines that it is appropriate for the proposed project utilizing the other solar technology to meet the requirements of this chapter or of some modification to either 9VAC15-40 or 9VAC15-60, as prescribed by the department for that particular project.
Historical Notes
Derived from Volume 28, Issue 21, eff. July 18, 2012.
Statutory Authority
§ 10.1-1197.6 of the Code of Virginia.