Section 360. Operation and reclamation  


Latest version.
  • A. Mining operations shall be conducted to minimize adverse effects on the environment and facilitate integration of reclamation with mining operations according to the special requirements of individual mineral types. Mining shall be conducted to minimize the acreage that is disturbed and reclamation shall be conducted simultaneously with mining to the extent feasible.

    B. Open pit mining of unconsolidated material shall be performed in such a way that extraction and reclamation are conducted simultaneously.

    C. Mining activities shall be conducted so that the impact on water quality and quantity are minimized. Mining below the water table shall be done in accordance with the mining plan under 4VAC25-31-130.

    D. Permanent lakes or ponds created by mining shall be equal to or greater than four feet deep, or otherwise constructed in a manner acceptable to the director.

    E. Excavation shall be done in such a manner as to keep storm drainage flowing toward sediment control structures. Diversions shall be used to minimize storm run-off over disturbed areas.

    F. The mining operation shall be planned to enhance the appearance to the public during mining and to achieve simultaneous and final reclamation.

    G. At the completion of mining, all entrances to underground mines shall be closed or secured and the surface area reclaimed in accordance with the mineral mining plan.

    H. Reclamation shall be completed to allow the post-mining land use to be implemented. After reclamation, the post mining land use shall be achievable and compatible with surrounding land use. All necessary permits and approvals for the post-mining land use shall be obtained prior to implementation.

Historical Notes

Derived from Volume 19, Issue 24, eff. September 11, 2003; amended, Virginia Register Volume 30, Issue 06, eff. December 19, 2013.

Statutory Authority

§§ 45.1-161.3 and 45.1-180.3 of the Code of Virginia.