Section 300. Voidance of construction permits  


Latest version.
  • Null and void. All well construction permits are null and void when (i) conditions such as house location, sewage system location, sewerage system location, topography, drainage ways, or other site conditions are changed from those shown on the application, (ii) conditions are changed from those shown on the construction permit, or (iii) more than 54 months elapse from the date the permit was issued. Reapplication for the purposes of having an expired permit reissued shall be the responsibility of the owner, and such reapplication shall be handled as an initial application and comply fully with 12VAC5-630-230.

Historical Notes

Derived from VR355-34-100 § 2.20, eff. April 1, 1992.

Statutory Authority

§§ 32.1-12 and 32.1-176 of the Code of Virginia.